Norampac Landfill Relocation Project

Client:
8360 Wiggins Holdings Inc.
Location:
Burnaby, BC

 
The Norampac Landfill in Burnaby BC needed to be relocated to the Vancouver and Hope (BC) Landfills.

Work includes excavation of approximately 300,000 m³ and stockpile of cover soil, removal and hauling of waste material offsite, backfilling and placement of structural backfill material after all waste has been removed.

Westminster Highway Culvert Replacement

Hard Ground Dredging & Sediment Remediation

South Delta Main No. 1 Replacement Phase 2

SeaBus Maintenance Dock Temporary Berth

Road Rail Utility Corridor, Ridley Island

Diavik Dike Foundation Preparation

Coquitlam UV Disinfection Plant

Annacis Island Wastewater Treatment Plant

Fraser River Forcemain Crossing – Land Portion

Middle Harbour Fill Site Remediation