Outfall Repair at Annacis Island Wastewater Treatment Plant

Client:
Metro Vancouver
Location:
Delta, BC

 
The project consisted of exploratory work to confirm the condition of existing outfall piping as part of Metro Vancouver’s efforts to facilitate long term maintenance, planning, and design. Emergency repairs were also required upon observed condition of the existing outfall.

Part of the work zone was inside the main navigation channel of the Fraser River so marine equipment needed to be staged to minimize disturbance to marine traffic. It also needed to be moved outside of the navigation channel when work was not actively being undertaken or when the crew was not on site.

Rainfall and strong currents limited the diving time so co-ordination and organization of crew was critical to maximize productivity during available dive windows. Additionally, poor visibility hindered divers’ ability to see equipment or loads in the water. GPS locators on divers and equipment allowed dive coordinators and equipment operators to see the live locations of divers and equipment and ensure diver safety while working near buckets and live loads.

Material infilling the excavation impeded the ability of the divers to carry out repairs. The airlift, which was used to remove this material, was supported by the crane thus enabling the divers to use a larger unit and move more material than with a smaller diver supported unit.

Westminster Highway Culvert Replacement

Hard Ground Dredging & Sediment Remediation

South Delta Main No. 1 Replacement Phase 2

SeaBus Maintenance Dock Temporary Berth

Road Rail Utility Corridor, Ridley Island

Diavik Dike Foundation Preparation

Coquitlam UV Disinfection Plant

Annacis Island Wastewater Treatment Plant

Fraser River Forcemain Crossing – Land Portion

Middle Harbour Fill Site Remediation